Work planned, coordinated and delivered by one team.
Looking for a general contractor in L'Assomption to run your project from start to finish? We coordinate the trades, the schedule and the finishing, in the old village and in the newer residential areas alike.

Service area
Home renovation in L'Assomption isn't like renovating in a newer suburb. As the seat of the MRC de L'Assomption, the town grew around an old village on the banks of the L'Assomption River. That core is full of heritage homes: woodwork, divided-light windows, siding and proportions you no longer see in new construction.
Around that core, the newer residential areas pose a different challenge: solid houses whose kitchen, bathroom and basement are all reaching the age where everything gets redone at about the same time.
Two realities, two approaches. In the old village, we choose materials and profiles that suit what's there, and check early what municipal bylaws allow when the work affects the building's exterior. In the newer areas, it's more about getting more out of spaces that already work: opening up, adding on, insulating better.
That's what guides how we approach home renovation in L'Assomption: understand the house before proposing anything.

Our services
Six services, one team. Whether the project covers one room or the whole house, you keep the same contact from the first call to the last touch-up.

Kitchen renovation in L'Assomption often comes down to one detail: in an older house, the walls are never perfectly square, and standard cabinets leave visible gaps. Custom or semi-custom cabinets, quartz or laminate counters, tile backsplash, plumbing and electrical to code: we redo the whole room and fit it to the house, not the other way around.
See our kitchen renovation service
In L'Assomption's older homes, the bathroom is often the smallest and worst-ventilated room on the floor. Vanity, tiled shower, shower base, waterproof membrane, drain and fan: we redo the whole room and use the open walls to fix moisture problems and replace outdated plumbing while it's accessible.
See our bathroom service
A basement in an older house needs an inspection before any commitment: ceiling height, moisture, the condition of the slab and the drain. Once those are sorted, insulation, vapour barrier, studs, drywall and soundproofing turn the space into a family room, office or bedroom. In newer houses, finishing usually goes faster: after the visit, we'll tell you honestly which case is yours.
See our basement finishing service
A home addition in L'Assomption starts with checks: setbacks, placement on the lot and, in the old village, special requirements for how the building looks. Foundation or helical piles, framing, roof and the tie-in to the existing house: we confirm feasibility and permits before we draw. Better to find a constraint on paper than on site.
See our home addition service
The building envelope takes the whole Quebec winter. Asphalt shingles, siding, soffits, fascia, gutters, windows and doors: on a house with character, the choice of profiles and colours matters as much as the quality of the installation. This work is planned from May to October; winter is for preparing quotes and placing orders, which leaves more date options in spring.
See our exterior renovation service
Near the river, a well-oriented patio changes how you use the yard all summer. Pressure-treated wood, cedar or composite, frame, joists, railings, pergola and BBQ module: we first plan how people move between the house, the outdoor kitchen and the yard, then the structure. Composite costs more up front and needs much less upkeep afterward.
See our patio and outdoor kitchen serviceHow we work
Hiring a general contractor in L'Assomption means one team coordinates the plumber, the electrician, the drywaller and the finisher, instead of you juggling five schedules that never line up. Here's how a project runs, from the first call to the last touch-up.
01
On site in L'Assomption, to see the real condition of the house and take measurements. Free of charge.
02
A detailed written quote, line by line, so you know exactly what you're paying for.
03
Materials, finishes and hardware chosen with you, based on your budget, how the room is used and the character of the house.
04
We coordinate the trades, with a schedule shared from the start and kept up to date.
05
A full walk-through together, touch-ups done and the site left clean.
Common questions
In most cases, yes. A municipal permit is usually required as soon as the work touches the structure, the building envelope or the footprint on the lot. In the old village, extra requirements may apply to the exterior look. We confirm what applies with the Town before we start, and we recommend you also check with the planning department.
Yes. An older house simply needs more checks up front: the condition of the framing, electrical, plumbing and insulation. Then we adapt materials and profiles so the new work fits with what's there instead of clashing with it. It takes longer to plan, and it avoids a house that looks patched rather than renovated.
It depends on the scope. A bathroom or kitchen is measured in weeks, an addition in months. In an older house, you also need a margin for what turns up once the walls are open: outdated plumbing, non-compliant wiring, framing to reinforce. We give a realistic schedule after the visit, not before.
Both work. Doing it all at once usually costs less per square foot, because the trades only come once. Phasing spreads out the cost and lets you live in the house more comfortably. If you choose phases, we plan the order so we never undo what was just done: plumbing and electrical first, finishing after.
A meeting, measurements and a clear quote. Free and with no obligation.
Learn more